Rack, enclosure and cooling hardware at build-out pace
Data centre hardware is sheet metal, joining and assembly work at a volume and a schedule most fabricators are not set up for. That is our home ground, and we are building for it now.
The four problems every data centre supplier brings us
Volume arrives all at once
Cells sized for a build-out schedule, installed in phases you can fund.
Large panels, flat faces
Forming and handling that keeps long enclosure panels true and unmarked.
Leak-tight liquid cooling
Manifold and cold plate joining designed with the fixture, not after it.
Variants on one line
Rack heights and cut-out patterns changed over from the part file.
Typical scope
Four typical scopes, from a single station to an integrated line. Tell us which one you are picturing and we will come back with a budget estimate against it.
Solutions and cells for data centre
Sheet metal forming
Roll forming, pressing, punching and folding, from coil to formed part.
Joining
Laser, plasma, MIG, TIG, spot, clinching and screwing as pre-engineered solutions.
Assembly
Folding, hemming, welding, lock seaming, clinching and screwing of sheet metal parts.
Material handling
AGVs and autonomous forklifts, fleet software, strapping, palletising and automatic truck loading.
